| Step 1: Select fairly level ground to place floor section. Plan to position floor section where door is in desired location. | ![]() |
| Step 2: Floor section should be set into place and leveled. Ensure ground is solid and level where the skid boards will rest. It may be necessary to use a shovel to remove sod or dirt in raised areas. The use of a 3 ft. level will provide the best results. |