To print the right hand
window, click in the
window before
the print button.

I. Site Preparation and
   Floor Placement

II. Wall Assembly
    Installation

III. Roof Frame
    Installation

IV. Roof Panel
    Assembly

V. Cupola Installation

VI. Installation of
   Ridge Cap Shingles

VII. Assemble Benches

VIII. Apply Protective
    Coating